Pictures 1-4: 

LEMOINE has nearly completed the installation of 143 drilled shafts for the foundation of the new Church, Bell Tower, and Student Center. We never could have imagined so many pieces of heavy equipment in the space at one time! The synchronicity of the work to drill and fill the shafts has been amazing to watch. There’s a nice picnic table at the edge of Girard Park across from the entrance to the new property and it is a great spot to bring your lunch and catch a sneak peak of the action.


Pictures 5-6: 

The work to complete the water main and sewer tie in at Girard Park Circle is now complete and the road is open, once again! Thank you for your patience and support during the road closure.



Excavations for Drilled Shafts
Excavations for Drilled Shafts
Drilled Shaft Installation
Drilled Shaft Installation

Drilled Shaft Installation


Drilled Shaft Rebar Placement and Concrete Poured
Drilled Shaft Rebar Placement and Concrete Poured

Water Main Tie-In


Sewer Tie-In under Girard Park Circle
Sewer Tie-In under Girard Park Circle

Flowfill Poured for Sewer Tie-In at Girard Park Circle

 
 
Our Lady of wisdom church 
and catholic student center

337-232-8742

info@ourladyofwisdom.org

​

Mailing Address:

P.O Box 43599
Lafayette, LA 70504

  • Facebook
  • YouTube
  • Instagram

Physical Address:

501 E St. Mary Blvd.

Lafayette, LA 70503

©2024 by Ragin' Cajun Catholics

bottom of page